Integrated ELV Installation for CIHP STEM Hub

Auxano delivered a complete ELV installation for CIHP STEM Hub, integrating structured LAN, IP telephony, CCTV surveillance, lightning protection, FM200 fire suppression, server room raised flooring, access control, rack power distribution, civil works, labeling, cable testing, and documentation.

IP telephony and communication infrastructure for CIHP STEM Hub ELV installation

Challenge

The operating gap that needed attention

The STEM Hub needed a modern, secure, and high-performance technology environment to support digital learning, collaboration, daily operations, and future expansion.

Auxano Response

A structured rollout from assessment to handover

1

Installed a robust structured LAN network and IP telephone system for collaboration and day-to-day operations.

2

Integrated CCTV surveillance, access control, lightning and thunder arrestor systems, and FM200 server room suppression.

3

Built server room readiness with raised flooring, rack power distribution, cable testing, labeling, documentation, and supporting civil works.

4

Configured, tested, and commissioned each ELV domain to support long-term reliability and maintainability.

Result

What changed after the project

CIHP STEM Hub received a secure, scalable, and future-ready infrastructure platform that supports STEM education, digital development, safety, communication, and operational continuity.

7 domains

ELV systems delivered

2024

Completed installation year

1 hub

Unified technology foundation

Related Capabilities

The service areas behind this outcome

These service areas show the practical delivery capabilities behind the project outcome.

structured lan cabling
office telephone system ip pbx
surveillance system cctv
door access control
data centre services
fire alarm safety systems

More Proof

Related case studies

View all
Structured network rack cabling for CIHP headquarters ELV infrastructure

Centre for Integrated Health Programs (CIHP)

Standards-Compliant ELV Infrastructure for CIHP Headquarters

Auxano delivered a complete Extra-Low Voltage infrastructure foundation covering structured LAN cabling, CCTV cabling, fiber backbone components, cable management, underground pathways, and FM200-ready fire suppression pipework.

Healthcare and Development ProgramsAbuja, Nigeria
View case study
Compliance and security infrastructure environment for Fringe PCI DSS upgrade

Fringe

PCI DSS-Aligned ICT Infrastructure Upgrade for Fringe

Auxano consolidated server virtualization, network redesign, firewall deployment, wireless expansion, endpoint upgrades, access control, surveillance enhancement, cloud backup, and IT support into one compliance-focused infrastructure program.

Financial Services and Regulated OperationsNigeria
View case study

Next Step

Need this kind of result in your own environment?

Share the site, system, or operational challenge and Auxano can shape the right assessment, rollout, and support plan.

Book consultation